50kW Solar System
A 50 kWp solar system produces about 65,000–77,500 kWh a year and mainly suits businesses and industry. ILIATORAS PHOTOVOLTAICS S.A. handles the study, installation, HEDNO and maintenance.
50 kW solar system: who it suits and how much it produces
50 kWp is a commercial system for industry, warehouses, hotels and supermarkets. Because consumption happens mainly during the day, a large part of the production is used on site. Under net billing the biggest benefit comes from the energy you use at the moment it is produced, so the right size matters more than ever: a system much larger than your consumption sends a large part of its production to the grid.
We have 14 specialised crews across Greece plus external partners. We use Huawei inverters and storage systems, and Huawei named us Top Installer 2025.
What a 50 kW system includes
| Feature | 50 kWp system |
|---|---|
| Panels | 110–125 panels, depending on panel power |
| Roof space | about 230–280 m² without shading |
| Inverter | Huawei, with an app to monitor production |
| Annual production | about 65,000–77,500 kWh (Northern Greece to Attica) |
| Suitable consumption | about 55,000–75,000 kWh a year |
| Battery | optional commercial storage |
| Panel warranty | performance warranty of typically 25–30 years |
| Support | 24-hour monitoring, 2-year maintenance contract and proper-operation guarantee |
Who is a 50 kW solar system right for?
Industry & manufacturing
Units with machinery, cold rooms or production lines working during the day.
For businesses →Warehouses & logistics
Large metal-sheet or panel roofs, ideal for solar, with lighting and cooling.
For businesses →Hotels & supermarkets
High consumption for air conditioning, refrigeration and hot water, peaking during the day.
Commercial batteries →How much a 50 kW system produces in each area
Indicative annual production with good south orientation and no shading:
| Area | Per 1 kWp | 50 kWp system |
|---|---|---|
| Northern Greece | 1,300–1,400 kWh | 65,000–70,000 kWh |
| Central Greece & Attica | 1,400–1,550 kWh | 70,000–77,500 kWh |
| Crete & southern islands | 1,500–1,650 kWh | 75,000–82,500 kWh |
Actual production depends on orientation, tilt, shading and equipment. You receive the exact estimate for your roof with the proposal.
How much of the production will you use?
Without a battery
A home typically uses 25–35% of its production on site. A business working during the day often uses much more.
With a battery
In a home this usually rises to 70–80%, because the midday surplus is used in the afternoon and evening. Businesses can add commercial storage, which reduces consumption peaks and stores the surplus for the hours without sun.
The surplus
Whatever you do not use goes to the grid and is compensated under net billing. That is why the system size should match your consumption.
Do you need 50 kW? Check it with your consumption
Enter your annual consumption in kWh. You will find it on your electricity bill, usually as “12-month consumption” or in a chart. The estimate is indicative, using ~1,350 kWh per kWp per year in Greece.
Exact sizing is based on your bills and your roof. Request a proposal →
Which solar system size suits you?
| System | Panels | Space | Production/year | Usually for |
|---|---|---|---|---|
| 5 kWp | 11–13 | 25–30 m² | ~6,500–7,750 kWh | homes of 3–4 people |
| 10 kWp | 22–25 | 45–55 m² | ~13,000–15,500 kWh | large homes and small businesses |
| 20 kWp | 44–50 | 90–110 m² | ~26,000–31,000 kWh | businesses and very large homes |
| 50 kWp | 110–125 | 230–280 m² | ~65,000–77,500 kWh | businesses and industry |
Not sure? Send us an electricity bill and we will propose the right size.
From first proposal to connection, in 4 steps
First proposal
You send us an electricity bill and photos of your roof. We propose a system size and terms, with no obligation.
Site inspection
Once we agree on the proposal, we arrange a site inspection at no charge, usually within about a week and a half, depending on availability.
HEDNO & installation
We submit the application to HEDNO (ΔΕΔΔΗΕ) and install the system, usually in 1–3 days for a home.
Connection
Once the HEDNO process is complete, the system goes live on net billing, with 24-hour monitoring and a 2-year maintenance contract.
We commit to an installation schedule after the site inspection, once we have seen the roof and the electrical panel.
If something is needed, who will come?
We do not leave your solar system after connection. With every project we monitor production and come out when needed.
14 specialised crews
Our own crews across Greece, together with external partners, so that we cover every area without long waits.
24-hour monitoring
A dedicated department of the company monitors all our installed projects. We often spot a problem before you notice it.
Fast response
We respond immediately to serious faults, except in very hard-to-reach areas, where timing depends on access.
2 years of maintenance
Every project comes with a 2-year maintenance contract and a proper-operation guarantee for the same period.
A contract that fits you
With the quotation we propose a maintenance contract for afterwards, tailored to your needs and those of the system.
Production on your phone
See every day how much the system produces and how much you consume, in the inverter app.
What you gain with Iliatoras
A solar system will work on your roof for 25 years or more. You need someone who will still be there after the installation.
- 14 specialised crews across Greece
- First proposal at no charge and with no obligation
- 2-year maintenance contract and proper-operation guarantee with every project
- Huawei Top Installer 2025
- Full handling of HEDNO and all paperwork
- Panels with performance warranties of typically 25–30 years
- 24-hour monitoring by a dedicated department
- Projects from 3 kW on homes to MW in industry
50 kW solar system: frequently asked questions
How much electricity does a 50 kW solar system produce?
About 65,000–82,500 kWh a year, depending on the area, orientation and shading. In Northern Greece about 65,000–70,000 kWh, in Attica and Central Greece about 70,000–77,500 kWh.
How much space does a 50 kW system need?
About 230–280 m² without shading, with 110–125 panels, depending on panel power. A flat roof needs slightly more space, because the rows are spaced so they do not shade each other.
Can my business’s roof take a 50 kW system?
In most cases yes, but we check it. During the site inspection our engineer examines the condition and strength of the roof and proposes the right mounting system.
How many years is the payback?
It depends mainly on how much of the production you use at the moment it is produced, whether there is a battery and the price you pay for electricity. In the proposal we send you, we calculate the payback period for your own case, based on your bills.
What equipment do you use?
Huawei inverters and storage systems (Huawei named us Top Installer 2025), and panels with performance warranties of typically 25–30 years. We propose the exact panel depending on the roof and the budget.
Do I need a permit for a solar system?
We handle the whole process: the HEDNO application up to connection and anything else needed for the specific building, which we check during the site inspection.
Does net metering still apply?
Not for new installations. New net metering applications stopped on 15 May 2024 and new self-consumption systems are connected under net billing.
Is a battery worth it with solar?
Under net billing, often yes. Without a battery a home typically uses 25–35% of its production directly. With a battery this usually rises to 70–80%, because the midday surplus is used in the evening.
Is the site inspection charged?
No. First we send you a proposal based on your bills and photos of your roof. Once we agree on the proposal, we carry out the site inspection at no charge, usually within about a week and a half, depending on availability.
What happens if there is a fault?
A dedicated department monitors all our projects with 24-hour monitoring. We respond immediately to serious faults, except in very hard-to-reach areas. Every project comes with a 2-year maintenance contract and a proper-operation guarantee for the same period.
How long do installation and connection take?
Installing a home system usually takes 1–3 days. The HEDNO process up to connection usually takes 1–3 months, and longer for large commercial systems.
Last updated: 4 November 2026. Production figures are indicative; the exact estimate is made in the study.
Request a proposal for a 50 kW solar system
Send us an electricity bill and photos of your roof. We will propose the right system, with no obligation.