Rooftop Solar Subsidy in Greece — What Applied & What's Next Ηλιατορας
☀ INFORMATION GUIDE

«Rooftop Solar» Subsidy in Greece: What Applied & What’s Next

Rates · Criteria · Battery · Programme status

The Greek state programme «Solar on the Roof» (Φωτοβολταϊκά στη Στέγη), funded by the Recovery Fund, subsidised rooftop solar with battery storage for homes, at rates up to 75%. Here you’ll find what it covered, who qualified, and what’s expected in the next cycle.

What’s coming in the new cycle →

up to 75%
household subsidy
90–100%
battery subsidy
€16,000
max grant
≤10.8 kWp
system size
ℹ️

Programme status (July 2026)

The current cycle has concluded (application deadline 30/6/2026, works completion 30/4/2026). A new cycle of subsidies via the Social Climate Fund is expected within the second half of 2026. This page is updated as soon as the new details are announced.

What was the «Solar on the Roof» programme

It was a programme by the Ministry of Environment & Energy (Recovery Fund, €238m budget) that subsidised a solar PV system together with battery storage on a primary residence, for self-consumption and energy autonomy. The subsidy rate depended on the income category — with no income criteria for entry.

Subsidised systems operate under the Net Billing scheme (Law 5106/2024). See the Net Billing guide →

Subsidy rates (2023–2026 cycle)

The rate for the PV system varied by income category. The battery was subsidised separately, at a much higher rate.

Beneficiary category Income PV subsidy
Vulnerable households low income / social tariff up to 75%
Households — Category A ≤€20,000 individual / ≤€40,000 family 65%
Households — Category B above thresholds 45%
Farmers 40% (up to 60%)

Battery: 90–100% (e.g. ~€890/kWh for vulnerable households). +10% for people with disabilities ≥67%, single-parent & large families. Max grant: €16,000 households · €10,000 farmers.

Who qualified — Criteria & requirements

  • Ownership or legal use of a primary residence with available roof space
  • Active electricity supply in the beneficiary’s name
  • An existing Connection Agreement with DEDDIE (HEDNO) — without an activated PV
  • The system must include a battery storage unit (mandatory for households)
  • No other PV subsidy for the same property

What the subsidy covered

🔆

Solar PV system

Panels, inverter & rooftop installation — up to 10.8 kWp for homes.

🔋

Battery storage

Subsidised 90–100%, capacity up to ~10.24 kWh — stores daytime production for the evening.

⚙️

Smart meter

For the net billing scheme & production/consumption monitoring.

How the process worked

  1. Eligibility checkIncome, roof, category — calculating your subsidy rate.
  2. Energy studyDesigning the PV + battery for your home’s consumption.
  3. Application on the platformOnline submission at pvstegi.gov.gr with TAXISnet codes.
  4. Approval & installationAfter approval, installing the PV + battery.
  5. Activation & disbursementDEDDIE connection, net billing activation and grant payment.

Frequently Asked Questions

Is the programme open now?
The 2023–2026 cycle has concluded (application deadline 30/6/2026). A new cycle of subsidies via the Social Climate Fund is expected within the second half of 2026 — we update this page as soon as it is announced.

How much did the programme grant?
For the PV system: up to 75% (vulnerable households), 65% or 45% depending on income, 40% for farmers. For the battery: 90–100%. Plus +10% for special categories. Maximum grant €16,000 for households.

Were there income eligibility criteria?
Not for entry — everyone could apply. Income only determined the subsidy rate, based on three categories.

Was the battery mandatory?
Yes, for households. The battery was subsidised at a very high rate and raises self-consumption from ~30% to 70–80%.

Is it linked to Net Billing?
Yes — subsidised systems operate under the Net Billing scheme. See the Net Billing guide.

When does the new cycle open?
The new generation of programmes (Social Climate Fund) is expected in the second half of 2026. Exact rates and criteria will be announced with the new ministerial decision.

📣 NEW CYCLE · H2 2026

Get ready for the next cycle

Iliatoras monitors the programme and prepares your installation (energy study, DEDDIE Connection Agreement) so you’re ready the moment applications open.

or email us at [email protected]