Rooftop Solar Panels 2026: The Complete Guide for Your Home
Rooftop Solar PanelsThe complete guide to installing solar panels on your home in Greece in 2026
In short: a solar system on your pitched roof or flat roof produces electricity for your home during the day, and with a battery in the evening too. New residential systems in Greece are connected under net billing. Typical home systems are 3–10 kWp, the grid connection with HEDNO (ΔΕΔΔΗΕ) usually takes 1–3 months, and the panels last 25 years or more.
Get a proposal for your roof →How a rooftop solar system works
The panels turn sunlight into direct current. The inverter converts it into alternating current, like the power from your sockets, and sends it first to the appliances in your home. Any surplus goes to the battery, if there is one, or to the grid.
Panels
Produce power whenever there is daylight, even on cloudy days, at lower output.
Inverter
Converts the power for household use and lets you monitor production from your phone.
Battery
Stores the midday surplus for the afternoon and evening.
What size solar system does a home need?
The right size depends on your annual consumption, which you will find on your electricity bills. In Greece each kilowatt (kWp) produces roughly 1,300–1,600 kWh per year, depending on the region, orientation and shading.
| System | Usually suits | Roof space (approx.) |
|---|---|---|
| 3–5 kWp | Apartment or small house with low consumption | 15–25 m² |
| 6–8 kWp | Detached house with air conditioning or an electric water heater | 30–40 m² |
| 10–10.8 kWp | Large house, heat pump or electric car | 50–55 m² |
A system larger than you need does not pay off under net billing, because the surplus is credited at less than the price you pay to buy electricity.
Tiled roof, flat roof or apartment building?
Tiled roof
The panels are fixed on special mounts under the tiles, without affecting waterproofing. Ideal orientation: south, south-east or south-west.
Flat roof
The panels sit on frames at the right tilt. The spacing between rows matters, so that one row does not shade the next.
Apartment building
The roof is usually common property, so the consent of the co-owners is needed. The space is shared between the apartments that want a system.
Shading
Trees, chimneys and neighbouring buildings reduce production. In the study we check shading for every season.
Do I need a battery?
Under net billing the biggest benefit comes from the power you use yourself. A home uses most electricity in the afternoon and evening, when the panels are not producing. That is why a battery makes a big difference.
A battery can also be added later, if the system has a hybrid inverter. We plan for this from the start.
The steps to a rooftop solar system
Study
Electricity bills, roof inspection, shading check and a size proposal.
HEDNO application
We submit the grid connection application to HEDNO (ΔΕΔΔΗΕ) for you.
Installation
For a home it usually takes 1–3 days.
Contract
Net billing contract with your electricity supplier, for 20 years.
Connection
HEDNO installs the meter and the system goes live.
From application to connection usually takes 1–3 months. Iliatoras handles the HEDNO application and all the paperwork.
What the cost depends on
- System size in kWp.
- Battery and its capacity in kWh.
- Roof type: tiled roofs, flat roofs and metal sheds need different mounting.
- Equipment: efficiency and warranties of the panels and the inverter.
- Your home’s electrical supply: single-phase or three-phase.
Payback depends mainly on how much of the power you use yourself. That is why we only quote after a study based on your own bills, at no charge and with no obligation.
Is there a subsidy for rooftop solar?
The national programme «Φωτοβολταϊκά στη Στέγη» (Rooftop Solar) has completed its cycle. What it covered and what is expected in the next cycle is on our page Rooftop Solar Subsidy in Greece.
Rooftop solar panels: frequently asked questions
How much electricity does a rooftop solar system produce?
In Greece each kWp produces roughly 1,300–1,600 kWh per year. A 5 kWp system therefore produces about 6,500–8,000 kWh, depending on the region, orientation and shading.
How much roof space do I need?
About 5 square metres per kWp. A 5 kWp system needs about 25 m² of unshaded space.
Can I install solar panels on an apartment building?
Yes. The roof is usually common property, so the consent of the co-owners is needed. Each apartment can have its own system connected to its own meter.
How long do solar panels last?
Quality panels work for 25–30 years and carry a performance warranty for that period. The inverter usually has a shorter lifespan and may need replacing at some point.
Do they need maintenance?
Very little. A yearly check and cleaning the panels when they collect dust or pollen is enough. You can follow production from your phone.
Does a solar system work on cloudy days?
Yes, at lower output. Total annual production is calculated from the actual sunshine data for your area.
Will I have power during a blackout?
A standard system switches off during a grid outage for safety. With a battery and suitable backup equipment, essential appliances keep running.
How long does the whole process take?
Usually 1–3 months from the HEDNO application to connection. The installation itself on a house takes 1–3 days.
Last updated: 23 October 2026. Connection rules and subsidy programmes change, so we confirm the current rules in every study.
Is your roof right for solar?
Send us an electricity bill and a photo of your roof. We will propose the right system, with or without a battery, at no charge and with no obligation.
Request a proposal →See also: Solar panels for home · Net billing